Activities

Naval Construction

Thanks to MAESSAs participation in important shipyard projects in Spain, we have become a leader in naval construction at a national level. We work on military projects for the Naval Fleets of Spain, Norway, Australia, Chile, Venezuela, and Malaysia, as well as civil projects; examples include Passenger Transport Ships, Oil Rigs, Dredges, and Freighters.

Main Projects

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10

GENERAL ELECTRIC

CUSTOMER: NAVANTIA

SITE: ALHD 1 & 2 SHIP FOR AUSTRALIAN NAVY

PROJECT: BLOCKS PREFABRICATION, OUTFITTING, PIPING AND INSULATION ERECTION AND SLIPWAY ASSEMBLY

YEAR: 2009-2012

GENERAL ELECTRIC

CUSTOMER: NAVANTIA

SITE: BPE FOR SPANISH NAVY

PROJECT: BLOCKS PREFABRICATION, OUTFITTING, PIPING AND INSULATION ERECTION AND SLIPWAY ASSEMBLY

YEAR: 2005-2008

GENERAL ELECTRIC

CUSTOMER: NAVANTIA

SITE: “S-80” SUBMARINES PROGRAMME (4 SHIPS) FOR SPANISH NAVY

PROJECT: SECTIONS PREFABRICATION, OUTFITTING AND SECTIONS ASSEMBLY

YEAR: 2008-2017

GENERAL ELECTRIC

CUSTOMER: NAVANTIA

SITE: MARITIME ACTION SHIP FOR SPANISH NAVY

PROJECT: BLOCKS PREFABRICATION

YEAR: 2009

GENERAL ELECTRIC

CUSTOMER: NAVANTIA

SITE: SURVEILLANCE OCEAN PATROL VESSEL PROGRAMME (4 SHIPS) FOR VENEZUELAN NAVY

PROJECT: BLOCKS PREFABRICATION

YEAR: 2007-2010

GENERAL ELECTRIC

CUSTOMER: LA NAVAL

SITE: SUCTION DREDGER OF 46.000 M3 B-335 FOR JAN DE NUL SHIPOWNER

PROJECT: PREABRICATION AND SLIPWAY ASSEMBLY OF STERN PACKAGE BLOCKS

YEAR: 2009-2011

GENERAL ELECTRIC

CUSTOMER: NAVANTIA

SITE: F-105 FRIGATE FOR SPANISH NAVY & F-310 FRIGATES PROGRAMME (5 SHIPS) FOR NORWEGIAN NAVY

PROJECT: BLOCKS PREFABRICATION, OUTFITTING, PIPING AND INSULATION ERECTION AND SLIPWAY ASSEMBLY

YEAR: 2006-2010

GENERAL ELECTRIC

CUSTOMER: LA NAVAL

SITE: “CRISTÓBAL COLÓN” SUCTION DREDGER OF 46.000 M3 FOR JAN DE NUL SHIPOWNER

PROJECT: PREFABRICATION AND SLIPWAY ASSEMBLY OF STERN PACKAGE BLOCKS

YEAR: 2007-2009

GENERAL ELECTRIC

CUSTOMER: LA NAVAL

SITE: “SIMÓN STEVIN“ SUCTION DREDGER OF 33.500 DWT B-333 FOR JAN DE NUL SHIPOWNER

PROJECT: PREFABRICATION AND SLIPWAY ASSEMBLY OF BLOCKS OF 3 PACKAGES (CENTRAL DECK ZONE PORT - BOW AND STERN PACKAGE)

YEAR: 2008-2009

GENERAL ELECTRIC

CUSTOMER: NAVANTIA

SITE: “ARTHUR N” ORE-CARRIER SHIP

PROJECT: REPLACEMENT OF 3 AUXILIARY ENGINES

YEAR: 2006

GENERAL ELECTRIC

CUSTOMER: NAVANTIA

SITE: “ALSTER N” ORE-CARRIER SHIP

PROJECT: REPLACEMENT OF 3 AUXILIARY ENGINES

YEAR: 2006

GENERAL ELECTRIC

CUSTOMER: NAVANTIA

SITE: CONSTRUCCIÓN C-509 Y C-510 OF FERRY FOR ACCIONA TRANSMEDITERRANEA

PROJECT: BLOCKS PREFABRICATION

YEAR: 2007-2008

GENERAL ELECTRIC

CUSTOMER: NAVANTIA

SITE: “CANTABRIA” COMBAT SUPPLY SHIP FOR SPANISH NAVY

PROJECT: BLOCKS PREFABRICATION

YEAR: 2007-2008

GENERAL ELECTRIC

CUSTOMER: NAVANTIA

SITE: “FAITH N” ORE-CARRIER SHIP

PROJECT: REPLACEMENT OF 3 AUXILIARY ENGINES

YEAR: 2006

GENERAL ELECTRIC

CUSTOMER: NAVANTIA

SITE: “SCORPENE” SUBMARINES PROGRAMME (4 SHIPS) 2 FOR CHILEAN NAVY AND 2 FOR MALAYSIA NAVY

PROJECT: OUTFITTING, PIPING AND INSULATION ASSEMBLY

YEAR: 2002-2009

GENERAL ELECTRIC

CUSTOMER: NAVANTIA

SITE: “SELLA & TURIA” SHIP FOR SPANISH NAVY

PROJECT: OUTFITTING, PIPING AND INSULATION ASSEMBLY

YEAR: 2002-2004